GARISSA COUNTY

Constituency

Project

Components

Area in acres

Crops grown

Status

Balambala

Construction of Holwadag Irrigation Project

Bush clearing of 100 acres, lining of main canal, construction of road crossings, supply of 1No irrigation pump

250

Maize & horticulture

Under Production

Ijara

Wiso water Pan and Irrigation project

Excavation of water pan and installation of greenhouses

10

Horticulture

The water pans are been utilized to provide water for domestic and livestock

Ijara

Elkambere water pan and Irrigation Project

Excavation of water pan and installation of greenhouses

10

Horticulture

The water pans are been utilized to provide water for domestic and livestock

Balambala

Construction of Rahole Canal Phase I Irrigation project

Construction of intake, water conveyance canal and infield irrigation system

5000

N/A

90% Complete

Fafi

·       Awagdera Water Pan

 

Excavation of water pan and installation of irrigation system

10

Horticulture

85% complete

Ijara

Constitution of Sangailu water pan

 Construction of water pan and installation of green houses

20

N/A

The water pans are been utilized to provide water for domestic and livestock